Construction Updates
Progress from the build-out, posted as it actually happens.
Read more about Construction UpdatesNow Scheduling Appointments in Rehoboth BeachOpening Late November or Early December 2026
Request an AppointmentSmile Studio of Rehoboth is being built at 19411 Plantations Road in Plantations Professional Park. We anticipate opening in late November or early December 2026.
The building envelope is closed in. Windows, exterior doors, and the roof are on.
Drain lines trenched, set to grade, inspected, and backfilled. Every fixture in the finished practice is now located.
Floor compacted and graded, vapor barrier laid, and screed lines set for the concrete pour.
Poured and finished. The slab that every operatory, chair, and cabinet sits on is now the floor the tile is going down onto.
Underway. Interior walls are up and finished, mechanical, electrical and data are roughed in overhead, and floor tile is being laid. Cabinetry and the operatories come next.
Dental equipment installed, commissioned, and tested.
Dr. Jonathon Cottone is introduced on our Meet the Team page. The rest of the clinical team will be announced there as hiring completes.
Scheduling is open. You can call the office or request an appointment online, and our team will confirm a time with you.
The exact opening date, published here and sent to the opening list first.
Only completed milestones are marked complete. We are not going to publish a percentage or a milestone date we have not been given. Construction schedules can change. Join our opening list for the confirmed opening date and early scheduling information.
Progress from the build-out, posted as it actually happens.
Read more about Construction UpdatesWhat we are designing into the space, and what has not been finalised.
Read more about Office FeaturesWhat we intend to install, described honestly as a plan rather than an inventory.
Read more about TechnologyMonday through Friday, 8:00 a.m. to 5:00 p.m., and why weekends are still open.
Read more about Planned Office HoursEverything we are being asked about the opening, answered.
Read more about Opening FAQJust off the Coastal Highway and Route 1 corridor, with access from the Route 24 and Route 9 corridors.
Opening list subscribers hear the confirmed opening date, provider introductions, and early scheduling information first.